Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22F00023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22F00023","OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PANTAO FLOOD MITIGATION SYSTEM, PANTAO, LIBON, ALBAY, LIBON, ALBAY 3","Flood Control and Drainage","Completed",48139996.4,0,100,"Region V","Region V","MAKAPA CORPORATION (30029) / PROTERRE CONSTRUCTION (50172)","2022-03-23","2022-12-18",2022,"Regular Infra - GAA 2022 OO-2",13.19964,123.32914,"500507000","500500000"]
SHA-256
75031e5e3dd791d03d139644b81880a7fe45d2fade04865fae16ff4b413d879c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.