Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22F00111

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22F00111","OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CULASI RIVER (PACKAGE 1), BRGYS. MATACLA, BAGUMBAYAN","Flood Control and Drainage","Completed",91648653.09,0,100,"Region V","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2022-03-24","2023-04-16",2022,"Regular Infra - GAA 2022 OO-2",13.69727,123.49554,"501715000","501700000"]
SHA-256
a429d86314337c0aa66257c93a87571f0eb0b40abf397288ef8749a97341946c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.