Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22F00158

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22F00158","CLUSTER IV-I: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SITIO GUIWANON SHORE PROTECTION STRUCTURES, BARANGA","GAA 2022 OO-2","On-Going",112708220.27,0,98.75,"Region V","Region V","CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)","2022-07-11",null,2022,"Regular Infra - GAA 2022 CSSP, Regular Infra - GAA 2022 OO-2",12.57043,123.6226,"504119000","504100000"]
SHA-256
791c4d3f02a478de1df67da098c4d7c2393f1415c596d83fc6108df6ba600784

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.