Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FB0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FB0032","OO2-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM, PUROK 6, QUIRANGAY, CAMALIG, ALBAY","Flood Control and Drainage","Completed",57898152.54,0,100,"Albay 2nd DEO","Region V","MUNTOPAR BUILDERS CORP. (29800)","2022-03-04","2022-09-29",2022,"Regular Infra - GAA 2022 OO-2",13.20734,123.65775,"500502000","500500000"]
SHA-256
13ee8b46b81356cc8573a14ebe1849509c0f58566832ae0f2b3d309f65849f54

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.