Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FB0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FB0127","OO2: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF ANOLING-CABANGAN-SALVACION FLOOD CONTROL SYSTEM (PHASE 2), CAMALIG, ALBAY","Flood Control and Drainage","Completed",53074980.79,0,100,"Albay 2nd DEO","Region V","MUNTOPAR BUILDERS CORP. (29800)","2022-04-13","2022-11-08",2022,"Regular Infra - GAA 2022 OO-2",13.19534,123.67834,"500502000","500500000"]
SHA-256
ee9b2b2df2aee73aa0da3198c69ad83df535a4b32c30e53c979f4cc309f6d876

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.