Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FC0053

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FC0053","CONSTRUCTION OF BASUD RIVER CONTROL, BASUD, CAMARINES NORTE, BRGY. POBLACION, BASUD, CAMARINES NORTE","Flood Control and Drainage","Completed",42136788.85,0,100,"Camarines Norte DEO","Region V","EUS CONSTRUCTION (21878)","2022-03-11","2022-09-12",2022,"Regular Infra - GAA 2022 CSSP",14.06372,122.97367,"501601000","501600000"]
SHA-256
0d25997f5e8332106e3b639dbe967b47cb23e86754692a20e017e044559ee704

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.