Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FF0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FF0035","002:CONSTRUCTION /REHABILITATION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE,BICOL RIVER FLOOD CONTROL,BRGY. TABUCO (TABUCO SECT.-LEFT SIDE), NAGA CITY","GAA 2022 OO-2","Completed",39052245.17,0,100,"Camarines Sur 3rd DEO","Region V","417 LP CONSTRUCTION CORPORATION (47591) / CPR CONSTRUCTION AND SUPPLY, INC. (FORMERLY: CPR CONSTRUCTION AND SUPPLY) (32698)","2022-04-06","2022-11-11",2022,"Regular Infra - GAA 2022 OO-2",13.61269,123.18574,"501724000","501700000"]
SHA-256
b3091819442a3da2e21cd617152d0d1052d18b82f5aaecbc0206ba8d95a10687

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.