Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FF0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FF0042","002;CONSTRUCTION/REHAB./IMPROVEMENT OF FLOOD MITIGATION STRUCTURE BICOL RIVER FLOOD CONTROL BRGY. PUNTA TARAWAL (PUNTA TARAWAL SECTION-LEFT SIDE) CALABANGA CAMARINES SUR","Flood Control and Drainage","Completed",67549873.69,0,100,"Camarines Sur 3rd DEO","Region V","PEU CONSTRUCTION AND SUPPLY (36369) / STEVEN CONSTRUCTION & SUPPLY (21987)","2022-04-06","2022-12-05",2022,"Regular Infra - GAA 2022 OO-2",13.72413,123.12509,"501708000","501700000"]
SHA-256
adbd29665c0f7574c4a2f2e0a586f861d0b6c9388e00c6175f0d235a5d530ee0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.