Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FF0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FF0050","002;CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONST./REHAB,/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE, BICOL RIVER FLOOD CONTROL BRGY. MANGAYAWAN (MANGAYAWAN SECTION-LEFT SIDE) CANAMAN CAM. SUR","Flood Control and Drainage","Completed",77199308.02,0,100,"Camarines Sur 3rd DEO","Region V","417 LP CONSTRUCTION CORPORATION (47591) / STEVEN CONSTRUCTION & SUPPLY (21987)","2022-04-01","2023-04-11",2022,"Regular Infra - GAA 2022 OO-2",13.61821,123.11831,"501710000","501700000"]
SHA-256
3525712b566fe9892f769918805c2cdac55da49e9a59033f751665e8f31d1770

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.