Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FG0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FG0014","REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, RANGAS BRIDGE II (B02550LZ) ALONG SAN RAFAEL-MAMPIRAO-SAN JOSE ROAD, BARANGAY MAMPIRAO, SAN JOSE, CAMARINES SUR","Bridges: Rehabilitation - Concrete (Superstructure) - without Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",4629282.99,0,100,"Camarines Sur 4th DEO","Region V","E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.) (5648)","2022-02-15","2022-05-02",2022,"Regular Infra - Bridges: Rehabilitation - Concrete (Superstructure) - without Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",13.67696,123.52106,"501733000","501700000"]
SHA-256
fc57ca673aca777432990463cc00fe5bced152e510986a16690b569dcc8d687f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.