Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FG0020

DPWH infrastructure contract

This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON

{
  "id": "oc4ids-pisoscan-dpwh-22FG0020",
  "title": "CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAPANAG RIVER UPSTREAM : STA. 0+000 - STA. 0+285.00 (R/S) AND STA. 0+000.00 - STA. 0+125.00 (L/S) DOWNSTREAM : STA. 0+000.00 - STA. 0+035.00 (BOTH SIDE) SAGNAY, CAMARINES SUR",
  "sector": [
    "Flood Control and Drainage"
  ],
  "status": "completed",
  "publicAuthority": {
    "name": "DPWH Camarines Sur 4th DEO"
  },
  "period": {
    "startDate": "2022-03-10",
    "endDate": "2022-10-07"
  },
  "budget": {
    "amount": {
      "amount": 29400000,
      "currency": "PHP"
    }
  },
  "locations": [
    {
      "geometry": {
        "type": "Point",
        "coordinates": [
          123.52137,
          13.59882
        ]
      }
    }
  ],
  "parties": [
    {
      "name": "STEVEN CONSTRUCTION AND SUPPLY",
      "roles": [
        "supplier"
      ]
    }
  ],
  "contractingProcesses": [
    {
      "id": "22FG0020",
      "summary": {
        "title": "CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAPANAG RIVER UPSTREAM : STA. 0+000 - STA. 0+285.00 (R/S) AND STA. 0+000.00 - STA. 0+125.00 (L/S) DOWNSTREAM : STA. 0+000.00 - STA. 0+035.00 (BOTH SIDE) SAGNAY, CAMARINES SUR",
        "status": "closed",
        "contractValue": {
          "amount": 29400000,
          "currency": "PHP"
        }
      }
    }
  ],
  "pisoscan": {
    "dpwhStatus": "Completed",
    "physicalProgressPercent": 100,
    "fundingSource": "Regular Infra - GAA 2022 CSSP",
    "sourceDataset": "DPWH contract list via BetterGov.ph",
    "sha256": "421fe37c12a804978921a88e061979659de014de1ddb04c3ab8b4243a9e555c9"
  }
}