Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FK0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FK0018","CONSTRUCTION_MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GIMALOTO RIVER CONTROL, SORSOGON CITY","Flood Control and Drainage","Completed",77165034.11,0,100,"Sorsogon DEO","Region V","AARCON BUILDERS (28336)","2022-02-17","2023-05-25",2022,"Regular Infra - GAA 2022 OO-2",12.96055,123.95735,"506216000","506200000"]
SHA-256
1a8a31309773fa34460bb91936e73123824d7db98a2ff96504dc4c6181cf8fd1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.