Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FO0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FO0057","CLUSTER IV: REHAB. OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) PHASE II IN LIBON, ALBAY AND REHAB. OF MAROCMOC BRIDGE FLOOD CONTROL STRUCTURE (RIGHT SIDE FACING UPSTREAM AND LEFT SIDE FACING DOWNSTREAM OF MAROCMOC BR","Flood Control and Drainage","Completed",93100000,0,100,"Albay 3rd DEO","Region V","RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES (8092)","2022-03-22","2022-12-16",2022,"Regular Infra - GAA 2022 CSSP",13.29439,123.39948,"500507000","500500000"]
SHA-256
35f397fbc6e8b9c259b6868cc69d1947e7eef3e11a4fd15e6979f20d74e827eb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.