Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GB0013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GB0013","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBALOM RIVER BRGY. BONGSOD, SIBALOM, ANTIQUE","Flood Control Structures, Roads","Completed",52941830,0,100,"Antique DEO","Region VI","TIBIAO-ANTIQUE N.K. ENTERPRISE, INC. (29292)","2022-02-18","2022-09-26",2022,"Regular Infra - GAA 2022 OO-2",10.80647,121.98429,"600616000","600600000"]
SHA-256
c833239d4761af3f4e56e4378459ba05725ff9cbe94031ef41a5032bece16ca0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.