Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GD0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GD0033","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, BALATUCAN RIVER CONTROL, PANITAN, CAPIZ","Flood Control and Drainage","Completed",62724502.62,0,100,"Capiz 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2022-02-28","2022-12-12",2022,"Regular Infra - GAA 2022 OO-2",11.44486,122.75841,"601910000","601900000"]
SHA-256
eba4ce8e40c20fc8c03d88ab286efcb82a8fb8ea40fb5843a24e1898800e719a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.