Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GD0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GD0041","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, PONTEVEDRA RIVER CONTROL INCLUDING ESPLANADE, PONTEVEDRA , CAPIZ","Flood Control and Drainage","Completed",62724396.82,0,100,"Capiz 1st DEO","Region VI","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2022-02-28","2023-12-21",2022,"Regular Infra - GAA 2022 OO-2",11.48423,122.82831,"601912000","601900000"]
SHA-256
a53aaf53bea50a869461480f88704083bcb1ff2282da3087facbe08ec63abe78

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.