Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GD0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GD0048","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITY ALONG PANAY/MAMBUSAO RIVER BASIN, JEBACCA RIVER CONTROL, MAAYON, CAPIZ","Flood Control and Drainage","Completed",57899349.35,0,100,"Capiz 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2022-03-27","2023-09-10",2022,"Regular Infra - GAA 2022 OO-2",11.3753,122.82476,"601907000","601900000"]
SHA-256
d7a7602eca1eae156403d347441eba2054c1e923fe02f0d75022bc11fbae5069

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.