Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GF0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GF0001","CONSTRUCTION OF NAHAPAY  TAGPU-AN RIVER FLOOD CONTROL PROJECT, GUIMBAL, ILOILO","Flood Control and Drainage","Completed",4851531.95,0,100,"Iloilo 1st DEO","Region VI","PANAY EAST COAST CONSTRUCTION & SUPPLY (26469)","2022-02-10","2022-07-04",2022,"Regular Infra - GAA 2022 OO-2",10.73207,122.32151,"603046000","603000000"]
SHA-256
1a6c59a7674c0f8817e23cf534611f260c1d434363e6c105564442ccaee3d217

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.