Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GF0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GF0027","CONSTRUCTION OF ANONOO-PARTITION RIVER FLOOD CONTROL PROJECT, GUIMBAL, ILOILO","Flood Control and Drainage","Completed",4857807.38,0,100,"Iloilo 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2022-03-29","2022-06-27",2022,"Regular Infra - GAA 2022 OO-2",10.68169,122.29641,"603020000","603000000"]
SHA-256
d0e66a3cb5a86bc0f8de531eafcc7a945b39cecfc50cc9618d185f200ea2f4de

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.