Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GF0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GF0035","CONSTRUCTION OF JAR-AO RIVER FLOOD CONTROL PROJECT, TUBUNGAN, ILOILO","Flood Control and Drainage","Completed",9702608.69,0,100,"Iloilo 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2022-02-10","2022-08-10",2022,"Regular Infra - GAA 2022 OO-2",10.76693,122.31697,"603046000","603000000"]
SHA-256
f56d137f74395187f238fd66c2b24d440043abdd296092a84eee326d5ebdd760

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.