Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GF0054

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GF0054","CONSTRUCTION OF SIBALOM RIVER FLOOD CONTROL PROJECT, TIGBAUAN, ILOILO","Flood Control and Drainage","Completed",9703074.2,0,100,"Iloilo 1st DEO","Region VI","PANAY EAST COAST CONSTRUCTION & SUPPLY (26469)","2022-03-29","2022-12-26",2022,"Regular Infra - GAA 2022 OO-2",10.67804,122.376,"603045000","603000000"]
SHA-256
9eedba84716b32e38452b052cee744916bc195002054f94c3c57634af669c46d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.