Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GF0108

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GF0108","CONSTRUCTION OF RIVER CONTROL STRUCTURES ALONG SIBALOM RIVER, TIGBAUAN, ILOILO","Flood Control and Drainage","Completed",4940135.94,0,100,"Iloilo 1st DEO","Region VI","PANAY EAST COAST CONSTRUCTION & SUPPLY (26469)","2022-05-23","2022-12-05",2022,"Regular Infra - GAA 2022 CSSP",10.678,122.37588,"603045000","603000000"]
SHA-256
996f4dee3ecc845aa3df00c21d0d32aa1352d28a1cd066035fd220e01a8933af

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.