Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GG0100

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GG0100","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN DUMANGAS, ILOILO","Flood Control and Drainage","Completed",19036065.74,0,100,"Iloilo 2nd DEO","Region VI","TIB TIMCO INFRA BUILDERS (47330)","2022-02-23","2022-08-05",2022,"Regular Infra - GAA 2022 OO-2",10.84407,122.65756,"603018000","603000000"]
SHA-256
8cf50eb0578825e33967644f808df323074d87fdaa815ccf24d3337093121974

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.