Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GG0169

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GG0169","CONSTRUCTION OF AGTAMBO BRIDGE AT BARANGAY AGTAMBO, PASSI CITY","Bridges","Completed",47555220.49,0,100,"Iloilo 2nd DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2022-09-28","2023-11-07",2022,"Regular Infra - GAA 2022 CSSP",10.84371,122.6585,"603018000","603000000"]
SHA-256
b0a41163b640e474248eb33762e995326c6e84b883927a77bdcb76ded9ccca2e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.