Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GH0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GH0034","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BAROTAC VIEJO RIVER, (STA. 4+337.60 - STA. 3+528.6), BRGY. POBLACION ILAWOD, BAROTAC VIEJO, ILOILO","Flood Control and Drainage","Completed",96500000,0,100,"Iloilo 3rd DEO","Region VI","MRZA CONSTRUCTION CORPORATION (49455) / ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION) (8546)","2022-03-25","2023-10-09",2022,"Regular Infra - GAA 2022 OO-2",11.02348,122.8531,"603008000","603000000"]
SHA-256
b2a18e4d14bc3236a01f08b374a4d6809bc694a556e30825855293d6c46371f0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.