Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GI0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GI0017","CONSTRUCTION OF AGANAN FLOOD CONTROL STRUCTURE (JARO-AGANAN RIVER), BRGY. POBLACION, ALIMODIAN, ILOILO","Flood Control and Drainage","Completed",96499040.75,0,100,"Iloilo 4th DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2022-02-18","2022-12-19",2022,"Regular Infra - GAA 2022 OO-2",10.81237,122.53064,"603043000","603000000"]
SHA-256
45fd10f8b00effdc58f657e6b95f34540496c333047ac62ee692e30992da6854

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.