Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GK0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GK0019","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF BAGACAY RIVER ALONG BACOLOD SILAY AIRPORT ACCESS ROAD, SILAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",48997998,0,100,"Negros Occidental 1st DEO","Negros Island Region","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2022-02-08","2022-09-16",2022,"Regular Infra - GAA 2022 OO-2",10.79064,122.96953,"1804526000","1804500000"]
SHA-256
4c8ad4d028d4c743ac162d320736e5b67b7f3bdfa64cfe316d7cf514b7f027e7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.