Project 22GL0041
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GL0041","CONSTRUCTION OF SU-AY RIVERBANK SLOPE PROTECTION (UPSTREAM/LEFT BANK OF SU-AY BRIDGE) ALONG BACOLOD SOUTH RD. BARANGAY SU-AY, HIMAMAYLAN CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",49000000,0,100,"Negros Occidental 2nd DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2022-02-17","2022-12-12",2022,"Regular Infra - GAA 2022 CSSP",10.19659,122.86227,"1804503000","1804500000"]
SHA-256
a7c100fb2fad54055595c073a8ed58aa296bb1da6d7b3ec36ba1ee19f48d7c97Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.