Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GM0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GM0007","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SIPALAY RIVER, SIPALAY CITY, NEGROS OCCIDENTAL, BRGY. MAMBAROTO, SIPALAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",52834715,0,100,"Negros Occidental 3rd DEO","Negros Island Region","JAIME B. CHING ENTERPRISES (4256)","2022-03-14","2022-11-21",2022,"Regular Infra - GAA 2022 OO-2",9.75818,122.42517,"1804527000","1804500000"]
SHA-256
c26ea805e186e81930d106798a1c0a81469df4692542d3e4a9dd977dea2765a4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.