Project 22GM0008
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GM0008","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SIPALAY RIVER, PHASE 2, SIPALAY CITY, NEGROS OCCIDENTAL, BARANGAY MANLOCAHOC, SIPALAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",33753548.3,0,100,"Negros Occidental 3rd DEO","Negros Island Region","JAIME B. CHING ENTERPRISES (4256)","2022-02-17","2022-09-21",2022,"Regular Infra - GAA 2022 OO-2",9.74817,122.504,"1804527000","1804500000"]
SHA-256
3cd9fb558c9d81d3b21e410d39efad40cb1659132ad125d70990e9408b4d2f05Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.