Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GO0108

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GO0108","CONSTRUCTION OF DRAINAGE SYSTEM, BACOLOD CITY, BACOLOD CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",16830000,0,100,"Bacolod City DEO","Negros Island Region","ALTA NEGROS INDUSTRIAL SUPPLY CORPORATION (33806)","2022-03-25","2023-02-27",2022,"Regular Infra - GAA 2022 CSSP",10.67776,122.97625,"1830200000","1804500000"]
SHA-256
35f03138a63aedbe3b0d0ffaeb4dc82a0bde7bdb7bd7950fc044411f6d87b4f4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.