Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22H00075

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22H00075","CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-RETROFITTING OF JACINTO BORJA 1 BRIDGE, (B00001BH), TAGBILARAN CITY, BOHOL","Bridges, Multi Purpose Buildings, Roads","On-Going",96499948.13,0,50.98,"Region VII","Region VII","CEBU 7H TECHNOCHEM INDUSTRIES, INC. (31578) / INFRAHUB CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY: OSCAR R. SARMIENTO CONSTRUCTION, INC.) (1411)","2023-06-23",null,2022,"Regular Infra - GAA 2022 CSSP",9.6299,123.87271,"701242000","701200000"]
SHA-256
9fa2c76cf4156e79aaaadbb97b0707b52b19f164146d304b5eff1923cd9d12b1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.