Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HB0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HB0010","CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONST. OF SLOPE PROTECTION ALONG JCT. (TER) GUINDULMAN-ANDA-BADIANG-COGTONG ROAD","Flood Control and Drainage","Completed",76929652.14,0,100,"Bohol 3rd DEO","Region VII","JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738) / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)","2022-04-12","2022-12-21",2022,"Regular Infra - GAA 2022 CSSP",9.80401,124.57802,"701203000","701200000"]
SHA-256
3f8759d729391f9b37ff0f0a588f1788b383a6b1b12c6076914750eb63ef1aa9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.