Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HB0096

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HB0096","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM- CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE (PACKAGE 3) BARANGAY JIMILI-AN L","Flood Control and Drainage","Completed",48998764.5,0,100,"Bohol 3rd DEO","Region VII","BOOMETRIX DEVELOPMENT CORP. (40441)","2022-04-26","2023-12-11",2022,"Regular Infra - GAA 2022 OO-2",9.6336,124.0298,"701229000","701200000"]
SHA-256
90c37ca06855a13ae4fea2f7570fd69650e8c5d03bcf7be99e8400a1042bec22

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.