Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HB0100

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HB0100","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS- CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE (PACKAGE 4) BARANGAY JIMILI-AN,","Flood Control and Drainage","Completed",48988729.71,0,100,"Bohol 3rd DEO","Region VII","LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION) (13524)","2022-04-12","2023-12-09",2022,"Regular Infra - GAA 2022 OO-2",9.63889,124.0286,"701229000","701200000"]
SHA-256
a099c12eafad20a82d19105da520b403e104e7a339b7ff89a4fd1eec245049ea

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.