Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HJ0112

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HJ0112","CONSTRUCTION OF ELEVEN (11) UNITS RAINWATER COLLECTOR SYSTEM AT NEGROS ORIENTAL 1ST DISTRICT","Water Provision and Storage","Completed",3069906.25,0,100,"Negros Oriental 1st DEO","Negros Island Region","GRAM CONSTRUCTION AND SUPPLY (35029)","2022-09-06","2022-11-06",2022,"Regular Infra - GAA 2022 CSSP",9.81683,123.03229,"1804602000","1804600000"]
SHA-256
779ed1201f6ad052099155fba41b25665238b3179209c345f6339bc108bdc080

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.