Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HL0081

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HL0081","BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF DRAINAGE CANAL AT APOLONG, VALENCIA, NEGROS ORIENTAL","Flood Control and Drainage","Completed",4950000,0,100,"Negros Oriental 3rd DEO","Negros Island Region","MG CONSTRUCTION (41069)","2022-04-19","2023-01-12",2022,"Regular Infra - GAA 2022 CSSP",9.29102,123.22816,"1804623000","1804600000"]
SHA-256
deaccb9f40e5c8b994aa998c43fb3c2d747bd825a334e97c591c9e312d8ef6cb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.