Project 22HM0054
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HM0054","CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BRGY. SAN ANTONIO, SI","Flood Control and Drainage","Completed",19600000,0,100,"Siquijor DEO","Negros Island Region","HELM CONSTRUCTION & SUPPLIES (34385) / W.GO CONSTRUCTION AND SUPPLY (39997)","2022-02-10","2022-09-09",2022,"Regular Infra - GAA 2022 CSSP",9.17575,123.54376,"1806106000","1806100000"]
SHA-256
f5e8e25c646e2ab3e059dacedcf72e9ffdb81316b92c74d9654083163803af36Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.