Project 22HO0054
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HO0054","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BRGY. VIVE RIVER FLOOD CONTROL (SECTION 2), RONDA CEBU","Flood Control and Drainage","Completed",48999980.42,0,100,"Cebu 7th DEO","Region VII","WTG CONSTRUCTION & DEVELOPMENT CORPORATION (7494)","2022-03-23","2022-10-25",2022,"Regular Infra - GAA 2022 CSSP",9.97286,123.46307,"702239000","702200000"]
SHA-256
707f2f8405a1c0dbd7e02e0b56053b9a578d6423a436431680c921640ff39a27Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.