Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HO0069

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HO0069","CONVERGENCE AND SPECIAL SUPPORT PROGRAM:  BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF WATERWAY ALONG TUBOD RIVER (SECTION 1), DUMANJUG, CEBU","Flood Control and Drainage","Completed",45539979.25,0,100,"Cebu 7th DEO","Region VII","QM BUILDERS (30743)","2022-03-23","2022-10-19",2022,"Regular Infra - GAA 2022 CSSP",10.02449,123.5098,"702224000","702200000"]
SHA-256
d59fe9c7cac0bea13c3963ec2ccdbc3de17b7131b99398bd1fc979a2c7bd2bc2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.