Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22IA0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22IA0034","CONSTRUCTION OF BUNGA FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, CABUCGAYAN, BILIRAN (124.590920°, 11.485933° - 124.589884°, 11.486235°)","Flood Control and Drainage","Completed",23471039.25,0,100,"Biliran DEO","Region VIII","M.B. ANG CONSTRUCTION & SUPPLY (25001)","2022-02-21","2022-07-30",2022,"Regular Infra - GAA 2022 OO-2",11.48597,124.59093,"807803000","807800000"]
SHA-256
32596c4c8a18d0a26beeac24e1349b4e5bb50acac70c79523ab935349a3156ce

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.