Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22IA0066

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22IA0066","CONSTRUCTION OF CABIBIHAN FLOOD CONTROL, BRGY. CABIBIHAN, CAIBIRAN, BILIRAN (124.556374°, 11.576766° - 124.554189°, 11.575158°)","Flood Control and Drainage","Completed",19582958.02,0,100,"Biliran DEO","Region VIII","SUNRISE BUILDERS (39757)","2022-02-21","2022-08-14",2022,"Regular Infra - GAA 2022 OO-2",11.57629,124.55648,"807804000","807800000"]
SHA-256
3c5996b8968875e97da939f01f5d152a54f0b5ca2a321de1d832b537d0425ead

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.