Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22ID0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22ID0041","RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BOCOG BRIDGE (B00070LT) ALONG DAANG MAHARLIKA (LT), MAC ARTHUR, LEYTE","Bridges","Completed",2866493.61,0,100,"Leyte 2nd DEO","Region VIII","BUILDTRON CONSTRUCTION CORPORATION (48375)","2022-03-21","2022-05-04",2022,"Regular Infra - GAA 2022 OO-1",10.84306,124.99573,"803730000","803700000"]
SHA-256
0404d37c2a5bac837e1b808180330383e1fdae0195e29fff6c34af31f43e83db

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.