Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22II0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22II0021","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE I, BARANGAY BANGON, GAMAY, NORTHERN SAMAR","GAA 2022 CSSP","Completed",48917835.03,0,100,"Northern Samar 2nd DEO","Region VIII","JCL CONSTRUCTION AND SUPPLY (50408) / JUPA CONSTRUCTION (23577)","2022-02-14","2022-10-15",2022,"Regular Infra - GAA 2022 CSSP",12.36466,125.2366,"804807000","804800000"]
SHA-256
3cf4ae664f640973f17123cbb528ca289199d5976e0c843033f0be92bb733712

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.