Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22II0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22II0022","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE II, BARANGAY BANGON, GAMAY, NORTHERN SAMAR","Flood Control and Drainage","Completed",48509900,0,100,"Northern Samar 2nd DEO","Region VIII","CDU CONSTRUCTION (13915)","2022-02-14","2023-05-05",2022,"Regular Infra - GAA 2022 CSSP",12.36482,125.23733,"804807000","804800000"]
SHA-256
933970547488eca5172bd3fcefc7de572e8737c307221c5b8244acb961cbe4d4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.