Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22IK0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22IK0021","CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAROBAYBAY, CALBIGA, SAMAR","Buildings and Facilities","Completed",4949979.48,0,100,"Samar 2nd DEO","Region VIII","ETAN CONSTRUCTION (39761)","2022-02-14","2022-07-13",2022,"Regular Infra - GAA 2022 CSSP",11.65815,124.98855,"806004000","806000000"]
SHA-256
61ae4103eab0bab4b7dc30ae28b64a7020fd75659af0303441b88c5dd445a85d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.