Project 22IL0107
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22IL0107","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SUBANG-DAKU FLOOD CONTROL (SUBA - KANANGKAAN SECTION), SOGOD, SOUTHERN LEYTE","Flood Control and Drainage","Completed",48999998.5,0,100,"Southern Leyte 1st DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2022-02-10","2023-03-14",2022,"Regular Infra - GAA 2022 OO-2",10.43249,125.02317,"806417000","806400000"]
SHA-256
c380ad6549e467a52c3cb9a3f7fa712f4ced9d53c94d94d4cc70bccee83981adHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.