Project 22J00026
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22J00026","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAYAWAN RIVER, LAYAWAN BRIDGE SECTION (BOO422MN) DOWNSTREAM ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSM","Flood Control and Drainage","On-Going",104825964.89,0,75.16,"Region IX","Region IX","MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION (19473)","2022-02-22",null,2022,"Regular Infra - GAA 2022 OO-2",8.40295,123.39677,"907210000","907200000"]
SHA-256
d954f2339919ef3a27747e550dfd64ba78411ecdeab466f30dee6c8b5b76f117Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.