Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22JF0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22JF0011","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUPILAC RIVER (PHASE III), R.T. LIM, ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",29149777.56,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","LAKEWOOD CONSTRUCTION COMPANY (5294)","2022-02-23","2022-05-15",2022,"Regular Infra - GAA 2022 OO-2",7.63122,122.44958,"908312000","908300000"]
SHA-256
ec340474efbf91dae563f3d10c986f3e873ac42dd3e2cd53286e6ef67cfd9166

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.