Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22JI0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22JI0051","CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), ALICIA, NATIONAL HIGH SCHOOL, CAMPUS B, ALICIA, ZAMBOANGA SIBUGAY","Water Provision and Storage","Completed",243305.35,0,100,"Zamboanga Sibugay 1st DEO","Region IX","KS AGAD CONSTRUCTION (41208)","2022-11-25","2022-12-15",2022,"Regular Infra - GAA 2022 CSSP",7.49833,122.95221,"908301000","908300000"]
SHA-256
a6a72cbceb45230fd973598da0d618bad77a0f2e548e8de4a64658edc0ee67a3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.